Manufacturing method for transporting device of silicon carbide furnace tube

Silicon carbide furnace tube has high temperature, wear resistance, corrosion resistance, high hardness, high strength, high thermal conductivity, high cold and hot sudden change performance, good oxidation resistance and other excellent properties, in a variety of heat treatment furnace, metallurgical sintering furnace and medium frequency furnace forging, non-ferrous metal smelting, chemical industry due to the weight of the furnace tube, the need to transport it after production, because there is not enough conveying device, Therefore, it is necessary to improve the efficiency of unified conveying furnace tubes.

碳化硅炉管

 

In order to achieve the above purposes, the following means are adopted.

A substrate, a pulley, a traction head, a supporting column and a bracket are provided with a pulley at the four corners of the lower end of the substrate, a traction head is provided on the left side of the substrate, a supporting column is provided at the front end of the substrate, a plurality of endurance plates are provided at the supporting column, and a projection is provided at the front end of the supporting column

Preferably, a rope is arranged on the winch and a fixing piece is arranged on the other end of the rope.

Preferably, a first keyhole is provided on both sides of the surface of the endurance plate, a second keyhole is provided on the supporting column, and a plurality of groups are provided on the second keyhole.

Preferably, the first locking hole is connected to the second locking hole via a locking rod.

Preferably, the central part of the surface of the endurance plate is provided with a fixed slot, and the fixed plate is connected with the fixed slot. Preferably, the signal output end of the switch is connected with the signal input end of the winch.

Preferably, the surface of the front end of the endurance plate is arranged on a pipe ditch, a plurality of groups are arranged on the pipe ditch, a belt is arranged on the back side of the endurance plate, a belt fixing member is arranged on the front side of the endurance plate, and a non-slip pad is arranged in the pipe ditch.

The silicon carbide furnace tube is placed in the tube groove at the front end of the weight plate, the furnace tube is fixed in the tube groove through the connection of the watch band and the buckle, and the fixed plate is connected through the fixed plate set at the lower end of the rope and the fixed groove set on the surface of the weight plate, so that the hoist rises to the appropriate height through the switch work, and the lock rod at the front end of the electrical box is removed, so that the lock rod goes through the first lock hole and the control The two keyholes are connected, and the weight plate is fixed on the pillar, and the fixed plate taken out is connected to the fixed groove of other endurance plates, which plays the role of conveying more furnace tubes and realizes conveying efficiency. The invention has simple structure and easy operation, has multiple groups of endurance plates, and can use the pipe groove arranged on the endurance plate to load furnace tubes, thereby improving the conveying number of furnace tubes and improving conveying efficiency The anti-slip pad placed in the tube groove can transport

The utility model relates to a vehicle light fixture, which has a substrate, pulley, traction head, supporting column and bracket, and provides a pulley at the four corners of the lower end of the substrate, a traction head is provided on the left side of the substrate, a supporting column is provided at the front end of the substrate, an endurance plate is provided at the supporting column, and a plurality of brackets are provided at the endurance plate It is practical to improve the conveying efficiency by increasing the number of furnace tubes.

The above is the production method of the transportation device of the silicon carbide furnace tube. If you need more information, you can contact us at any time!

 

 

Post time: Oct-11-2023